Jury Evaluation Form

(Project Evaluation)

1.Scientific Part:

              Comprehensibility of the project ( 5p)
              Appropriateness and sufficiency of the data collected ( 5p)
              Suitability of the methods used ( 5p)
              Evaluation of the data ( 5p)
              Consistency of the aims and results of the project ( 5p)
             The diversity and use of the resources ( 5p)

2.Practical application of the projects; benefits for society in certain ways (25 pts)

3. The originality of the idea that is emphasized (25 pts)

4. The practicability of the results (20 pts)